ISU LINGKUNGAN PEMBANGUNAN JARINGAN TRANSMISI SUTT 150 KV PLTP KARAHA BODAS KE GI MALANGBONG, KABUPATEN TASIKMALAYA DAN GARUT, PROPINSI JAWA BARAT
Abstrak
The plan construction Transmision line SUTT 150 KV of the PLTP Karaha Bodas at (Sub-District of Kadipaten) to Mainhouse Electricity Malangbong (Sub-District Malangbong) will raise effects to the environment. Identification are the stage of the potential impact before EIA study. Identification is one of the stage to get isues in the field to minimize all the effects that will appear in the future to support sustainable development.
Kata Kunci
identification, enviromental impact assesment, sustainable development
Teks Lengkap:
PDFDOI: https://doi.org/10.24198/bsc.v8i2.8248
Refbacks
- Saat ini tidak ada refbacks.